Greater Vernon Water: Surge Protection Valve - Buchanan Road

Estimated Start Date
May 17, 2023
Estimated End Date
October 27, 2023
Address
Buchanan Road at Ricardo Road
Participating Community
Area D
District of Coldstream
Status
Completed

Project Description

A summary of specific work items includes the following (approximate quantities):

· Installation of 600mm diameter water main including appurtenances and valves, ~ 45m.

· Construction of concrete retaining walls and concrete kiosk slab, ~ 51m2 and ~26m2 respectively.

· Installation of an above ground surge relief kiosk includes surge relief piping and appurtenances,

instrumentation, electrical distribution and controls, and radio telemetry pole.

· Installation of a 2100mm diameter energy dissipation/ surge manhole.

· Installation of an infiltration tank including geotextile and gravels, ~ 50m3.

· Installation of 600mm diameter storm sewer including manholes, ~ 190m.

· Construction of an energy dissipation and dispersal ditch includes a winged headwall, geotextiles, and rip rap.

· Road restoration and parking lot construction with subbase, base and asphalt pavement, ~520 m2.

· Road shoulder, driveways, and surface restorations.

Timeline
Complete
No
Contact Information

Prime Contractor:

Chapman Industries Ltd.

Darryl Lauridsen

250-308-6332

Robert Boger

McElhanney Ltd.